A list of defects is not an inspection report

An inspection report that lists defects without grading them has handed the judgement back to you.

We see these regularly. A neat list of findings, a worn hold, corrosion here, fraying there, a loose fixing, and then a signature. Everything on it is true. Nothing on it tells the person responsible what to do.

The question a centre manager has at eight in the morning is not what is wrong with the wall. It is whether to open, and what has to happen before they can stop worrying about it. A list does not answer that. A list leaves the person who was not at height, who did not touch the fixing and who has a timetable to run, to decide which line matters most.

So every finding in a Bluco report carries a category from 1 to 5. One is an observation only, with nothing to do. Two is something to monitor at the next inspection. Three is where a date starts: we recommend remedial action within thirty days. Four is serious, and we recommend restricting use of the affected area within seven days. Five is immediate danger, and we recommend withdrawing the structure from use straight away.

Two things keep that scale honest. The first is that it is ours. BS EN 12572 defines no categories of finding and no timescales for putting things right, and a report that implies otherwise is claiming an authority it does not have.

The second is that every category is a recommendation. We give the date, the risk and what we recommend. The decision rests with the duty holder, and our reports say so.

For a Category 4 or 5 we do not leave it to the report. We tell a named person on the day, and the report records who was told, when, and how.

Each finding also says what it rests on: a clause of the standard, a manufacturer's instruction, or our own judgement, named as such. A category tells you how much it matters. The basis tells you why we think so.

None of this is a proprietary idea, and we would be pleased if it became normal. The inspector was the one with hands on the structure. Making the judgement is the job, not an extra on top of it.

If you have a report in front of you, two questions will tell you most of what you need. Does every finding say how serious it is and by when something should be done? And does it say who decided that, and on what basis?

Our free seven-page guide sets out what BS EN 12572 actually asks of the person responsible for a climbing wall — and what it does not: get the guide.