Services  /  Bouldering wall inspection

Bouldering wall inspection, to BS EN 12572-2

A bouldering wall has no ropes, so the floor is the safety system. We inspect the wall, the matting beneath it and the space a climber can fall into, anywhere in the UK, and report what was measured.

Request an inspection

What is inspected

The wall is only half of it

Bouldering walls have their own part of the standard, and most of what it adds is about where a climber lands.

What we find

The findings have been in the floor

On the bouldering walls we have inspected, the findings have been in the floor rather than the wall: matting stopping short of where a climber can land, particularly to the sides and around corners, and gaps that have opened between mats.

How far the matting has to reach depends on the height of the face, and it is measured out from the furthest point the wall overhangs to, not from its foot. So it is measured face by face, not judged by eye, and a wall that has been made taller or steeper since the mats went down is measured as it is now.

The report

One face, one measurement

A bouldering wall is a set of faces sharing one floor. The report gives each face its measured height and the matting in front of it and beside it, so a shortfall points to one face and one dimension.

Every finding is categorised 1 to 5 and says what it rests on: a clause of the standard, a manufacturer's instruction, or our own judgement, named as such.

Who we work for

From a nursery traverse to a bouldering centre

We inspect bouldering centres and low traverse walls in schools and nurseries, to BS EN 12572-2. We do not inspect playground equipment, which has its own standards. If it is not clear which a wall is, we settle that with you before the visit.

See walls we have inspected

How it works

What to expect, from booking to sign-off

Stage 01

Book it in

Tell us the wall, the site and when it's due. We confirm the scope, including whether equipment is to be inspected as well and any known issues, and arrange a date around your timetable.

Stage 02

On site

We measure and inspect the wall, the matting and the space around it, assessing every finding against the standard on the day, and tell you what we have found before we leave.

Stage 03

Report and sign-off

You receive a report with every finding categorised 1 to 5 and its basis named, so you know what needs doing, by when, and what can simply be monitored.

Related services

The rest of what we do

Working at height, done properly

Booking an inspection, or planning a new wall? Let's talk.

Get in touch