Three levels of inspection

Which inspection is this?

BS EN 12572 describes three levels of inspection, for roped and bouldering walls alike. They differ in depth and in who carries them out. How often each one happens is set by the manufacturer's instructions for the structure, not by a fixed calendar.

Your staff

Routine visual

The frequent look-over that catches obvious change: damage, something loose, something out of place. Done by the people who open the wall.

Your staff, or us

Operational

A closer check of how the wall and its equipment are working and wearing, carried out at the interval set for the structure.

Bluco Projects

Main

The full inspection of the structure by a competent person, at the interval set for that structure. This is the visit most people mean when they ask for a climbing wall inspection.

Read the free guide to the inspection regime

The report

Findings you can act on

Every finding is scored 1 to 5 against a fixed action timescale, tied to the exact place on the wall it belongs to, and says what it rests on: a clause of the standard, a manufacturer's instruction, or our own judgement, named as such.

The report names the standard and edition the wall was inspected against, says what was inspected and what could not be, and is checked and signed before it is issued. It is written for the person who carries the responsibility for the wall, not for another inspector.

By independent we mean independent of the duty holder: the inspection is not carried out by the people who run the wall.

Who we work for

Any wall, any size

Climbing centres, schools, nurseries and universities. A single traverse wall is inspected with the same method as a full centre.

See walls we have inspected

How it works

What to expect, from booking to sign-off

Stage 01

Book it in

Tell us the wall, the site and when it's due. We confirm the scope, including whether equipment is to be inspected as well and any known issues, and arrange a date around your timetable.

Stage 02

On site

We inspect the structure up close using rope access, assessing every finding against the standard on the day, and tell you what we have found before we leave.

Stage 03

Report and sign-off

You receive a report with every finding categorised 1 to 5 and its basis named, so you know what needs doing, by when, and what can simply be monitored.